Terapix Star Formation Region IC 1396, © 2001 CFHT
Teraminutes for the meeting of Friday December 5th, 2008
Article
by HJMCC - Updated December 16th, 2008

Minutes of the December 5th 2008 Terameeting

Yannick's summary document

Present: Yannick, Henry, Fred, Mathias S. (video conf), Greg, Patrick, Mathias M.

Hardware (Fred)

-  Problem with mix10 system disk. Origin of the problem unknown; disk system is corrupted. Unable to boot from system disk.

-  Mix3 card arrived at Agorus; still waiting for the delivery of the card.

-  mix22, mix23, mix23, youpix ready; waiting for 9U stockage system. All machines will be delivered within the next few days.

-  These machines will be installed the empty rack.

-  mix7 / 3ware: Fred will back up the raid and reconstruct with a different card; people are asked to removed unecessary data from this machine.

-  one Seagate disk will be returned to Seagate (30 euros)

T0005 documentation

-  There are still many typos and wrong comments on the pages; Mathias will correct them.

-  Releasix stocks all the QF counts / QF pages as well as all .head and .ahead files.

Hudson PI data :Patrick and Yannick

-  Test to combine WIRCAM + MEGACAM images and use scamp to do the astrometric solution to get the most uniform solution. Seems to work well. Henry wonders if fields with a very large number of WIRCam images will be handled properly.

Ibata WIRCAM data (Patrick)

-  A big problem with saturated objects in the catalogues; this degrades the astrometric / photometric solution.

-  Bright galaxies (Barmby) ; special changes made in dithering.

-  Bouvier (nebular data). Astrometry good. however one exposure is a Stellar field full of saturated stars which again causes problems for the astrometric solution.

Pipeline: Greg/Mathias)

-  Structure of database needed changes.

-  Mathias explains how condor policy can be set globally in youpi to control how the jobs can be dispatched on the cluster.

-  In the job monitoring there are jobs which are still marked as running even though they are no longer operating. No idea why.

Other matters

-  Rich Bielby probably has to sign a bit of paper to have access TERAPIX cluster.

-  Yuliana Goranova will arrive on Dec. 15 and will be be in Anthony's office.

Next meeting: 16.12.08 at 14.30 in the afternoon.


Site Map  -   -  Contact
© Terapix 2003-2011